Regrading the Yard

Last weekend, some of you may have seen that I posted the following photo on Twitter:

12 cubic yards of top soil

This is what 12 cubic yards of top soil looks like.

This is 12 cubic yards of top soil, dumped on my front yard, waiting to be spread across the yard to fill in all the low spots and to make sure that water would drain away from the foundation rather than towards it. KP had a blast nibbling away at it.

KP eating dirt

KP discovers 12 cubic yards of top soil, eats it.

My wife and I worked all Friday afternoon and evening, and most of the day Saturday, but we finished it up.

Here’s what the yard looks like now:

Backyard. This dirt is like 8"-12" deep.

Backyard. This dirt is like 8″-12″ deep.

Drainage towards garage valley gutter.

Drainage towards garage valley gutter.

Old tree stump hump.

Old tree stump hump.

Draining away from foundation.

Draining away from foundation.

Backfilling around walkway.

Backfilling around walkway.

Our lot is so flat, that most of the positive drainage away from the foundation is subtle at best, but we just don’t have any other options. It will have to do.

Here’s a nice before and after that demonstrates our progress pretty well. Back in 2012, I posted about doing some work on the flower beds  in front of the house. I posted the following picture – notice how much of the stone pavers are showing. At least 6″ – Maybe 8″.

little wall

little wall

Then a couple weeks ago I posted some photos of the new concrete walkways, and pointed out how high the new walkway was poured compared to the ground and the pavers. Notice that the pavers are just totally eclipsed by the walkway, and the front edge of the concrete is completely visible.

New sidewalk. Notice how high it is compared to the ground.

New sidewalk. Notice how high it is compared to the ground.

Now here’s a similar angle after spreading all the new top soil around. Notice we removed the pavers (and stacked them up next to the house since they weren’t doing much anymore now anyway. Also notice that we’ve completely backfilled around the walkway.

Final grading.

Final grading.

Again, the drainage is subtle, but it’s all we can do without either raising the house up, or lowering the street elevation, neither of which is going to happen.

Oh yea, I also pulled a muscle and can barely move my arm now, lol.

2 comments to Regrading the Yard

Leave a Reply

  

  

  

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>